v1.28 — Enterprise Era
v1.28 — Enterprise Era

Structured Data

Release Metadata

Era Context

Enterprise Era

Knowledge packs, den operations, electronics education, vision-to-mission pipeline, MCP integration, brainstorming, and OpenStack cloud platform.

Progression Metrics

Capabilities Introduced

Architectural Decisions

  • 8-priority ISA-encoded message bus with Dispatcher routing — dead-letter handling and message pruning for reliability; ISA encoding provides machine-readable message type classification at priority boundaries
  • 10-position staff topology in 5 operational divisions — Coordinator, Relay, Planner, Configurator, Monitor (Command Division); Executor, Verifier (Operations Division); Sentinel, Chronicler (Safety Division); Dashboard (Interface Division)
  • 4 auto-selected topology profiles (Scout/Patrol/Squadron/Fleet) — profile selected based on phase count; Scout (1-2 phases), Patrol (3-5), Squadron (6-10), Fleet (11+) — each profile is a subset role hierarchy
  • Priority 0 HALT/CLEAR emergency stop — 9-type recovery decision matrix in Sentinel position; HALT preempts all other messages regardless of queue depth; CLEAR resets to known-good state

Breaking Changes

None.

Leave a Reply

Your email address will not be published. Required fields are marked *